Platform foundation
Azure Landing Zone & Governance Build
Management groups, policy sets, subscription vending, the RBAC model and naming standards — built as Terraform with a pipeline that applies it, so the platform you end up with is the one that's written down.
The problem this solves
Azure estates rarely start with a platform. They start with a subscription someone created for a project, then a second one for a different team, then a third because the first two had become untouchable. By the time anyone draws the diagram there are a dozen subscriptions under no particular hierarchy, policy assigned in three places with different intent, RBAC granted directly to named users, and resource names that encode a convention nobody can reconstruct.
None of that is a security incident on its own. It is worse than that: it is an estate where no statement about the whole is reliable. You cannot say what is enforced, who can do what, or what a new subscription will inherit, because the answer depends on which path through the hierarchy you take.
What gets built
- Management group hierarchy designed around what actually differs between your workloads — regulatory scope, environment, and the blast radius you want policy to respect — not a copy of your org chart, which will change before the hierarchy does.
- Policy baseline as assignable initiatives, with each effect chosen deliberately. Audit, Deny and DeployIfNotExists are three different tools with three different failure modes, and the exemption process is designed up front rather than discovered later.
- RBAC model built on groups and custom roles where the built-ins don't fit, with privileged access PIM-eligible rather than standing. Most estates grant Owner because Contributor can't assign roles — a narrow custom role solves that properly.
- Subscription vending — a repeatable path from request to a correctly placed, correctly tagged, correctly budgeted subscription, so the next one doesn't start the drift over.
- Network foundation — hub and spoke or Virtual WAN, address plan with room to grow, DNS design including private resolution, and egress control.
- Naming and tagging standards that are enforced by policy rather than documented in a wiki, including the tags your cost reporting depends on.
- Diagnostic and log routing to a workspace design that matches your retention obligations rather than the default.
Delivered as code. Everything above arrives as Terraform in your repository, with a pipeline that plans on pull request and applies through an approval gate. The handover is a working deployment and the code that produced it — not a design document and a bill.
If you already have an estate
Most of this work is brownfield, and a landing zone built beside a live estate is only useful if there is a path to move the live estate into it. That path is part of the engagement: what gets imported into Terraform state, what gets rebuilt, what stays where it is with a documented exception, and the order that keeps each step reversible.
Policy goes on in audit mode first, in every case. Compliance data against the real estate tells you what Deny would have broken, which is the only honest way to decide when to turn it on.
What you receive
- A deployed management group hierarchy, policy baseline and RBAC model in your tenant
- The Terraform repository and pipeline that produced it, documented well enough for your team to extend
- A subscription vending runbook
- An architecture decision record for each significant choice, so the reasoning survives after I'm gone
- A working session with your team on operating and extending it
How it's scoped
Scope follows the number of subscriptions, whether a compliance framework is in play, and how much of the existing estate needs importing rather than building fresh. Quoted as a fixed fee against a written scope, with change windows agreed in advance.
If you don't yet know which of those apply, the posture assessment establishes it — it maps the current hierarchy, policy state and RBAC model as part of its normal pass, and that output is the input to this engagement.
Quoted in writing against an agreed scope after a scoping call. No hourly billing. Most builds run four to eight weeks of elapsed time, with your team's involvement concentrated in design review and approval gates.
Is this the right starting point?
A short email describing your environment and what's prompting the question is enough to get a straight answer — and if this isn't the engagement you need, I'll say so.