Getting there
Azure Migration Design
A migration fails on the things decided before the first VM moves: where the landing zone ends, what talks to what, which waves can move together, and what the rollback is. This engagement produces the target architecture and the wave plan, then runs the cutovers.
Migrations fail before the first VM moves
The technology of moving a virtual machine into Azure is largely solved. Replication tools work, cutovers are routine, and the vendors have made the mechanical part of it unremarkable.
What goes wrong is decided earlier: an address plan that collides with the existing network, a dependency nobody mapped until a cutover weekend, a landing zone that wasn't ready so the first wave landed in a subscription that then became permanent, a licensing position nobody checked, and an application whose owner heard about the move on the Friday. Those are design failures, and they are expensive in a way that the replication is not.
What gets designed
- Target architecture. Where workloads land, how they're segmented, what stays on-premises and for how long, and what the steady state looks like once the datacenter is gone. Hybrid is a destination for some workloads and a waypoint for others, and the plan should say which is which.
- Landing zone readiness. Subscription topology, policy, RBAC and network foundation in place before wave one, because the first wave sets precedent that is hard to reverse. If the foundation isn't there, it gets built first.
- Address plan and connectivity. Non-overlapping ranges with room for growth, ExpressRoute or VPN during coexistence, DNS resolution across both sides, and the egress path.
- Dependency and wave planning. What talks to what, discovered from data rather than from documentation, grouped into waves that can move without splitting a chatty dependency across the WAN for three weeks.
- Sizing and licensing. Right-sized targets from real utilization rather than provisioned specification, with Azure Hybrid Benefit, reservations and savings plans decided before the meter starts — commitment discounts are the cheapest cost lever and the one most often applied last.
- Cutover runbooks. Per-wave, with validation steps, a rollback position and a named decision-maker for the go/no-go.
- Decommission plan. What gets turned off, when, and how the backups of retired systems satisfy retention without quietly billing forever.
Lift-and-shift is not a failure. Rearchitecting during a migration doubles the number of things that can go wrong on a cutover weekend and makes rollback nearly impossible. Move it, stabilize it, then modernize what's worth modernizing — with the modernization scoped as its own piece of work rather than smuggled into a move.
VMware and Nutanix specifics
Both estates carry assumptions that don't survive the move unexamined: shared storage behaviour, snapshot-based backup that has no equivalent on the target, cluster-level HA that Azure expresses differently through availability zones, and guest-level licensing that changes cost once it's no longer on your own hardware. Each needs a decision before a wave, not during one.
Fifteen years of on-premises infrastructure behind this, including VMware, Nutanix, Rubrik and Zerto estates — the source side is not unfamiliar territory.
What you receive
- Target architecture document and address plan
- Dependency map and wave plan with sequencing rationale
- Sizing and licensing model with a cost projection
- Per-wave cutover runbooks with rollback positions
- Decommission and retention plan
- Cutovers executed in weekend windows where you want them run rather than handed over
How it's scoped
Scoped by workload count, number of waves, and whether you want the design only or the design plus the cutovers. Fixed fee against a written scope. Design and execution can be contracted separately — plenty of teams want an architect for the plan and their own hands on the keyboard for the move.
Design and execution quoted separately against an agreed scope. Cutover windows scheduled in advance, typically weekends, with a documented rollback position per wave.
Is this the right starting point?
A short email describing your environment and what's prompting the question is enough to get a straight answer — and if this isn't the engagement you need, I'll say so.